Vertiv VRT ai moat: latest change 2026-02-13 Applied Digital APLD ai moat: latest change 2026-07-29 TSMC TSM ai moat: latest change 2026-04-16
Moat rating narrow

The FY2025 10-K splits its competition into niche players (Delta, Stulz, Johnson Controls, Socomec) and large-scale globals (Schneider, Eaton, Legrand, Huawei) — real differentiation inside a field that contains several larger diversified rivals.

source: sec.gov

none

The FY2026 10-K (filed 2026-07-29) shows contracted revenue, not a demonstrated competitive edge. About 1,410 MW is leased under 15-year take-or-pay, non-cancellable base terms worth about $36.2 billion, but only about 100 MW of the roughly 1.5 GW that is contracted and either operating or under construction was operating and earning revenue at May 31, 2026, and Item 1A says "lessees may have the right to terminate applicable leases if there are significant delays in construction." Item 1A also concedes "We do not have the resources to compete with larger providers of similar products or services at this time," and the Competition section names 13 power-advantaged developers the company competes with. Signed leases give revenue visibility, but the filing does not show a durable advantage.

source: sec.gov

wide

TSMC's 2025 Form 20-F reports a 59.9% gross margin (up from 56.1% in 2024) and describes the company as "the technology leader among the dedicated foundries" in advanced (7-nanometer-and-below) node revenue — a durable, hard-to-replicate process-and-scale advantage that rivals with "greater financial and other resources" have not matched.

source: sec.gov

Moat type switching costs

The filing pairs installed critical infrastructure with a lifecycle service estate — preventative maintenance, project management, acceptance testing, remote monitoring, spares — across more than 40 countries; ripping out the vendor means ripping out the service relationship too.

source: sec.gov

none

The 10-K claims three advantages: power-advantaged sites (it believes securing power and interconnection ahead of demand is 'the principal constraint on new HPC capacity and a core differentiator for us from many of our competitors'), a standardized 'franchise-style' design, and hyperscaler master service and master telecom service agreements 'that are difficult to obtain.' The filing does not show any of them to be durable. Its Competition section says competition 'centers on securing and developing sites with access to large-scale, reliable, and cost-competitive power and interconnection' and names 13 power-advantaged developers going after the same leases, and Item 1A concedes it lacks the resources to compete with larger providers. Signed leases are take-or-pay and non-cancellable, so a tenant leaving for convenience owes 'the full remaining contractual value,' but that is contractual lock-in on each lease rather than a moat source, so no moat type is assigned.

source: sec.gov

intangibles ip

Per its 2025 Form 20-F, TSMC "compete[s] primarily on process technologies, manufacturing excellence, customer trust and service quality" and has "been issued a substantial number of patents," with 2-nanometer in volume production in 2025 and 16-angstrom risk production targeted for 2026 — proprietary process-technology know-how and IP, not merely capital (the filing explicitly notes some competitors may have greater financial resources yet still trail), are the core barrier.

source: sec.gov

Leadership co leader

Named against Schneider Electric and Eaton among global competitors; the filing claims differentiation through application expertise and the most comprehensive portfolio — attributed, not independently measured.

source: sec.gov

behind

The 10-K makes no leadership claim and gives no ranking or share figure. Item 1A concedes "We do not have the resources to compete with larger providers of similar products or services at this time" and that some rivals have "substantially greater liquidity and financial resources than we do." Its Competition section places APLD against established operators (Digital Realty, Equinix), hyperscalers that build their own capacity, independent developers and 13 named power-advantaged developers (IREN, Cipher Digital, TeraWulf, Hut 8, Riot, CleanSpark, HIVE, Core Scientific, Bitdeer, Galaxy Digital, Fermi, Keel Infrastructure, MARA).

source: sec.gov

clear leader

Self-described in its 2025 20-F as "the technology leader among the dedicated foundries" in net revenue of advanced semiconductors at 7-nanometer and below; reached 2nm volume production in 2025, and Epoch AI estimates ~90% share of global advanced-node fabrication.

source: sec.gov

Pricing power moderate

The filing lists price as one of five competitive bases but leads with reliability and quality, and sells into customers 'in some of the world's most critical industries' — where downtime, not price, is the binding constraint.

source: sec.gov

weak

Item 1A says "Due to the limited number of hyperscalers, we expect that a limited number of customers will continue to account for a high percentage of our revenue for the foreseeable future," and that if customers' equipment usage declines or they discontinue use of its facilities, APLD "may be compelled to lower our lease prices in some instances or risk losing a significant customer." One customer was 59% of FY2026 revenue from continuing operations. Take-or-pay, non-cancellable terms protect contracted revenue over the base term, and Note 19 reports a $39.1M HPC Hosting segment profit on $385.3M of segment revenue in FY2026, but those terms are agreed with a small group of concentrated buyers.

source: sec.gov

strong

2025 gross margin of 59.9% (up from 56.1% in 2024), attributed in the 20-F to higher capacity utilization and cost improvement, reflects strong pricing power at the leading edge despite the heavy capital intensity of new-node ramps.

source: sec.gov

Summary

Vertiv sells the power and cooling that AI compute physically cannot run without, and its filing leads with 'first-to-market designs engineered for next-gen rack-scale artificial intelligence compute.' Its customers are 'the world's most critical industries' — hyperscale, colocation, neocloud and enterprise data centers — where competition, by the filing's own account, runs on reliability, quality, price, service and customer relationships. The differentiation claims are the company's own; the breadth of the named competitor set is the check on them.

Applied Digital designs, builds and operates purpose-built, liquid-cooled HPC data centers, which it calls 'AI factories', and leases the capacity to CoreWeave and investment-grade hyperscalers. At May 31, 2026 its 10-K lists five campuses (Polaris Forge 1-3 and Delta Forge 1-2) with about 1,410 MW contracted under roughly 15-year take-or-pay, non-cancellable leases worth about $36.2 billion over the base terms. The filing claims three sources of advantage: it controls power-advantaged sites, it uses a standardized 'franchise-style' design built to deliver about 150 MW in about 14 to 18 months, and it holds hyperscaler master agreements that are 'difficult to obtain.' The same document shows how early the company is. About 100 MW was operating and earning revenue. One customer was 59% of FY2026 revenue from continuing operations. It competes with Digital Realty, Equinix, hyperscalers that build their own capacity and 13 named power-advantaged developers, and it concedes that it lacks the resources to compete with larger providers. Signed leases give long-dated revenue visibility, but the filing does not show a durable competitive advantage.

TSMC is the world's largest dedicated semiconductor foundry and, per its 2025 Form 20-F, the self-described technology leader among dedicated foundries in advanced (7nm-and-below) node revenue, having reached 2-nanometer volume production in 2025 with 16-angstrom risk production on track for 2026. Independent research (Epoch AI) estimates it controls roughly 90% of global advanced-node fabrication; sustained by US$7.9 billion of 2025 R&D, a large patent portfolio and 59.9% gross margins, this process-technology and scale advantage has proven durable even against rivals with greater financial resources.

Chain position

Layer-7 power and cooling under every AI rack.

Developer and landlord of power-advantaged, liquid-cooled AI data-center capacity, leased long-term to CoreWeave and investment-grade hyperscalers.

The critical leading-edge fabrication and advanced-packaging (CoWoS) layer of the AI supply chain — high-performance computing was 58% of TSMC's 2025 revenue, and it supplies leading-edge N2/N3/N4 logic to the fabless IC-design and system companies that design AI accelerators.

Products (share / barrier)
  • Blockchain data center hosting (Jamestown / Ellendale) Niche · Low source: sec.gov
  • HPC data center leasing (Polaris Forge / Delta Forge AI factories) Challenger · Moderate source: sec.gov
  • Advanced packaging (CoWoS) Leader · Deep source: epoch.ai
  • Leading-edge foundry (advanced-node logic, 7nm and below incl. N3/N2) Leader · Deep source: sec.gov
  • Mainstream & specialty foundry technologies Top 3 · Moderate source: sec.gov
Long-horizon vote +0.13 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

-0.20 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.42 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →