Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing X-energy×Cipher Mining×Walmart× maximum of 3 — remove one to swap
X-energy XE ai moat: latest change 2026-08-13 Cipher Mining CIFR ai moat: latest change 2026-02-24 Walmart WMT ai moat: latest change 2026-03-13
Moat rating narrow

Real but unbuilt. The Q2 2026 10-Q shows the moat resting on regulatory standing rather than delivered product: the NRC completed the Environmental Assessment for the Dow Long Mott construction permit application on 18 May 2026 with a Finding of No Significant Impact, yet no Xe-100 has been constructed or operated and two counterparties supplied nearly all income, with the U.S. Government at 90.3% and Dow at 4.4% of total revenue and grant income for the three months ended 30 June 2026.

source: sec.gov

none

Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none.

source: sec.gov

narrow

Graded on the Item 1A text this run could read from the FY2026 10-K, which is where the filing argues hardest against a wide band. It says "each of our segments competes for customers, employees, digital prominence, products and services" with local, regional, national and global physical, eCommerce and omnichannel retailers, social commerce platforms, wholesale club operators, retail intermediaries "and emerging agentic shopping tools and platforms," that "the omnichannel retail landscape is highly competitive and rapidly evolving, and the entry of new, well-funded competitors, or more rapid development of AI capabilities and agentic tools by these competitors ... may increase competitive pressures," and concedes that "for eCommerce and other internet-based businesses, newer or smaller businesses may be better able to innovate and compete with us" and that there "can be no assurance" Walmart can adopt AI "as quickly or effectively as our competitors." It also warns of retail consolidation producing rivals with "improved financial resources, improved access to merchandise, greater market penetration." The filing claims no market share, rank or scale advantage anywhere in the text available here, and its own competitive-landscape discussion sits in Item 1, which the cached read-through returned only as a cross-reference; a wider band would not be sourced.

source: sec.gov

Moat type intangibles ip

The IPO prospectus describes an 'intellectual property-driven business model': revenue is to come from technology fees for licensing the proprietary Xe-100 design plus proprietary TRISO-X fuel, and the company states it will not construct, own or operate the power plants. The durable assets are therefore patents and NRC licences, not plant, installed base or scale.

source: sec.gov

none

No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers.

source: sec.gov

cost scale

What the readable text does describe as durable is physical and logistical scale rather than lock-in or IP. It says Walmart sources "from a wide variety of domestic and international suppliers," that global sourcing is "an important factor in our financial performance," and that finding suppliers able to supply "in the large volumes we may demand" is itself a challenge; it describes a network of stores, clubs and distribution and fulfillment centers in which "many products available for purchase online can be picked up by the customer or member at a local Walmart store or Sam's Club, which provides additional customer traffic at such stores and clubs"; and it lists "supply chain automation and enhancements" among the investments backing the strategy. The first competitive lever it names is "the prices at which we sell our merchandise." The filing offers no intangibles or switching-cost claim beyond noting that protection of its trademarks, copyrights, domain names, patents and trade secrets "may not be available in every jurisdiction."

source: sec.gov

Leadership co leader

The prospectus records X-energy as one of two awardees under the DOE Advanced Reactor Demonstration Program, and it holds the Oak Ridge HALEU fuel-fabrication licence; but it is not the NRC design-approval leader — the NRC issued a standard design approval to NuScale for the US460 small modular reactor, published at 90 FR / Federal Register document 2025-10123 on 4 June 2025, while the Xe-100 is being licensed indirectly through a customer's Part 50 construction permit and holds no design certification or approval of its own.

source: sec.gov

fast follower

No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted.

source: sec.gov

co leader

The 10-K text available this run asserts no rank or share for Walmart. The band reflects two things the filing does say: that its strategy is meant to let it "maintain or grow our overall market position" across segments that already compete at global scale, and that it does not describe itself as ahead in the channels that matter most to it - "for eCommerce and other internet-based businesses, newer or smaller businesses may be better able to innovate and compete with us," and on AI adoption "there can be no assurance that these investments will deliver the anticipated benefits, or that we will be able to adopt and leverage these technologies as quickly or effectively as our competitors." Treat this band as bounded by the missing Item 1 competition discussion, not as a measured position.

source: sec.gov

Pricing power weak

Nothing has been priced in a market yet. The prospectus states the Xe-100 technology fee is a benchmarking assumption to be 'negotiated on a case by case basis' with no assurance customers will accept the proposed structure, and that Amazon holds first-priority manufacturing queue slots across 2031-2039, a right of first refusal and most-favoured pricing; the 10-Q records a 2025 warrant issued to a related-party customer with a $162.7 million grant-date fair value accounted for as consideration payable to a customer, i.e. a reduction of the transaction price.

source: sec.gov

weak

The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power.

source: sec.gov

weak

The filing names price first among the ways it competes - "we compete in a variety of ways, including the prices at which we sell our merchandise" - and states that higher supplier labour and material costs may "adversely impact product margins ... that we are unable, or choose not, to pass on to our customers." It adds that macro conditions can "change the mix of products we sell to any one or more markets with a lower average gross margin" and "result in slower inventory turnover and greater markdowns of inventory." In health and wellness the price is set by counterparties, not by Walmart: "a large majority of our retail pharmacy net sales are generated by filling prescriptions for which we receive payment through established contractual relationships with third-party payers and payment administrators, such as private insurers, governmental agencies and pharmacy benefit managers," exposing it to "reductions in the third-party reimbursement rates for drugs."

source: sec.gov

Summary

X-energy's defensible assets today are regulatory and intellectual, not commercial. NRC Special Nuclear Material Licence SNM-7007, issued 13 February 2026 for a 40-year licence period, authorises HALEU fuel manufacture at Oak Ridge, and the company's own prospectus calls it the first-ever Category II nuclear fuel facility licensed in the United States; the Long Mott construction permit application for four Xe-100 reactors has reached its uncontested mandatory NRC hearing, scheduled for 22 September 2026. Neither has yet produced a reactor or a commercial fuel pebble: the prospectus expects TX-1 to be completed in the first half of 2028, and the 10-Q describes present revenue as derived from cost-share agreements such as the DOE ARDP. The HALEU feedstock the fuel depends on is a live dependency rather than a settled advantage — the prospectus states HALEU enrichment services are available only in limited quantities globally and that customers procure the feedstock, and the 10-Q discloses a definitive enrichment agreement with Centrus Energy announced 6 August 2026 under a phased approach with prepayments by X-energy to support Centrus's domestic capacity programme.

Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent.

In the FY2026 10-K text readable this run, Walmart describes an "enterprise strategy, which combines traditional retail, membership models, marketplaces, financial services, health and wellness and other customer and business services into a series of interconnected assets to make it seamless for customers to interact with us," carried by stores, clubs and distribution and fulfillment centers that double as pickup and delivery nodes and by continuing investment in eCommerce, AI and supply chain automation. The filing sets its own limits on that: it calls the omnichannel landscape "highly competitive and rapidly evolving," warns that well-funded entrants and faster AI or agentic tooling by rivals may increase pressure, that smaller businesses may out-innovate it online, and that "a greater concentration of eCommerce sales, including increasing online grocery sales and the increasing role of AI-enabled platforms in product search, discovery, advertising and purchasing, could result in a reduction in the amount of traffic in our stores and clubs." On economics it concedes supplier cost increases it may be "unable, or choose not, to pass on to our customers," and it points investors to "advertising and other higher-margin initiatives (which are expected to help drive our operating income growth at a rate faster than net sales over the long term)" rather than to price.

Chain position

Upstream supplier of reactor technology and TRISO fuel to industrial-heat and data-centre power buyers; it licenses the design and fabricates the fuel rather than owning or operating the plants.

Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining.

A retailer that also intermediates: it sells its own sourced merchandise, hosts third-party marketplace sellers for whom it may provide "fulfillment, inventory management, tax collection, payment processing, content," sells digital advertising against that traffic, dispenses prescriptions under PBM and payer contracts, and offers financial services "including through our digital channels, stores and clubs, as well as our OnePay fintech venture."

Products (share / barrier)
  • Bitcoin mining (Odessa) Unknown · Low source: sec.gov
  • HPC data center leasing (Black Pearl, Barber Lake, Stingray) Challenger · Moderate source: sec.gov
Long-horizon vote +0.05 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

-0.06 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

+0.05 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →