Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| Adobe | Cipher Mining | Arm Holdings | |
|---|---|---|---|
| Moat rating | narrow The FY2025 10-K's own Competition section says the markets for Adobe's solutions are characterized by 'limited barriers to entry, short product lifecycles, customer price sensitivity ... and the frequent entry of new solutions or competitors', and Item 1A adds that Adobe 'face[s] increasing competition from companies offering generative and agentic AI solutions, including but not limited to prompt-based and multi-modal creation and editing, document productivity and understanding' - the two categories that carry the Digital Media segment. That disclosed contestability caps the moat below wide, while the same filing's industry-standard app designations and 89% consolidated gross margin keep it well above none. | none Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none. | wide Arm's FY2026 20-F states it "maintained market share in the mobile applications processor market of greater than 99% for many years," and describes the Arm platform as "the most pervasive architecture in the world," with "more than 350 billion Arm-based chips reported as shipped cumulatively" as of March 31, 2026 — a durable, dominant position. |
| Moat type | switching costs The 10-K frames Adobe's differentiation as an integrated ecosystem the customer's work lives inside: Creative Cloud Pro subscribers get 'cloud storage to easily sync, access, collaborate and share their work, files and assets', the AI platform offers a choice of models 'without the friction of switching between workflows and platforms', and on the enterprise side 'Our competitive differentiation comes from the increased value we provide customers by integrating the Adobe Experience Platform with our comprehensive set of solutions'. 96% of FY2025 revenue is subscription, with $22.52B of remaining performance obligations, up 13% year over year. | none No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers. | intangibles ip Per the 20-F, Arm's advantage rests on its proprietary CPU architecture (ISA), which "is essentially a common language for software developers" and "sets the foundation for a large library of compatible software," reinforced by switching costs: customers "likely would incur significant costs in switching to competitors' architecture." |
| Leadership | clear leader In the segment that is 74% of FY2025 revenue ($17.65B of $23.77B) the 10-K asserts leadership outright: Illustrator 'our industry-standard vector graphics app', After Effects 'our industry-standard motion graphics and visual effects app', Acrobat 'a leading document productivity app', and 'category and brand leadership' in the Competition section. The claim does not extend to the whole company - the same section says the marketing solutions 'face broad competition from large, established enterprise software and cloud companies'. | fast follower No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted. | clear leader 20-F: >99% share of the mobile applications processor market for many years and "the most pervasive architecture in the world"; principal contested arena is the fast-growing data-center CPU market, where Arm is still a challenger to x86. |
| Pricing power | strong Per the same 10-K's segment table, Digital Media earned a 95% gross profit margin in FY2025 (96% FY2024, 95% FY2023) and consolidated gross margin held at 88%/89%/89% across FY2023-FY2025 while revenue grew 11% to $23.77B. 96% of revenue is subscription and remaining performance obligations reached $22.52B, up 13%. Item 1A's warning of 'downward pressure on pricing and gross margins' has not shown up in realized margin. | weak The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power. | strong GAAP gross margin was ~98% in FY2026 ($4,799M gross profit on $4,920M revenue), up from 97% (FY2025) and 95% (FY2024), and royalty growth was driven by "an improved mix of products with higher royalty rates per chip, such as Armv9 technology" — evidence of per-chip pricing power. Caveat: the 20-F notes ASPs decline over a chip generation and royalty per chip generally falls as volume rises. |
| Summary | Adobe's durable advantage is the cost of leaving rather than any disclosed market share. Its FY2025 10-K calls Illustrator 'our industry-standard vector graphics app' and After Effects 'our industry-standard motion graphics and visual effects app', describes Acrobat as 'a leading document productivity app', and sells them as one subscription ecosystem where assets, workflows and collaboration are cloud-resident. The economics follow: Digital Media earned a 95% gross profit margin on $17.65B of FY2025 revenue, 74% of the company. The same filing is unusually candid about the limits, calling its markets characterized by 'limited barriers to entry' and warning that competition will 'continue to intensify' with named generative and agentic AI entrants in both creation and document productivity - so the moat reads narrow rather than wide, held today by realized pricing and switching costs rather than by structural protection. | Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent. | Arm's durable advantage is its proprietary CPU architecture plus the software ecosystem locked to it: as of March 31, 2026 more than 350 billion Arm-based chips had shipped cumulatively, the platform "supports a global community of more than 22 million developers" and "runs the vast majority of the world's software," which underpins its greater-than-99% share of mobile application processors held "for many years." |
| Chain position | An AI-application layer company that both builds its own commercially safe Firefly foundation models and licenses 'an extensive ecosystem of third-party models', distributing generative AI into creative, document and marketing workflows. | Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining. | Arm licenses the CPU architecture and core IP that sit at the foundation of nearly all mobile SoCs and a growing share of AI/cloud data-center CPUs (CSP in-house Grace/Graviton-class designs and Arm's own AGI data-center CPU), placing it upstream of much of the AI compute stack. |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | +0.24 at weight 0.20 · swarm neutral Editorial prior, not backtested. | -0.06 at weight 0.20 · swarm bearish Editorial prior, not backtested. | +0.42 at weight 0.20 · swarm neutral Editorial prior, not backtested. |