Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing AMD×Cipher Mining×ASMPT× maximum of 3 — remove one to swap
AMD AMD ai moat: latest change 2026-02-04 Cipher Mining CIFR ai moat: latest change 2026-02-24 ASMPT ASMVY ai moat: latest change 2026-07-29
Moat rating narrow

AMD's FY2025 10-K documents real but bounded advantages: approximately 7,200 U.S. patents and roughly 18,900 patent matters worldwide, an outright claim that 'We are the market share leader in semi-custom game console products,' and gross margin of 50% on revenue up 34% to $34.6 billion. The same filing sets the ceiling: 'Some of our competitors may possess stronger market positions, larger customer bases, more design wins, and greater financial, sales, marketing, and distribution resources than us'; Nvidia is named 'the discrete GPU market share leader'; and AMD relies on TSMC 'for the production of all wafers for microprocessor and GPU products at 7 nanometer (nm) or smaller nodes.' Advantages that are genuine, contested, and dependent on a shared foundry are narrow, not wide.

source: sec.gov

none

Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none.

source: sec.gov

narrow

ASMPT has a real but contested position in thermo-compression bonding (TCB), and its returns were thin until 2026. On the durable side, TrendForce (2025-12-12, citing The Elec) reports that SK hynix 'is using about fifty sets of TC bonders for HBM4 production, with roughly half supplied by ASMPT'. It adds that Hanmi had been SK hynix's exclusive TC bonder supplier for HBM 'until last year, when ASMPT joined the supply chain toward year-end'. ASMPT's FY2025 results announcement reports TCB revenue growth of about 146% and calls the company the 'Process-Of-Record' in chip-to-substrate bonding, which is its own claim. On the limiting side, the market is shared. TrendForce (2026-06-09, citing ET News) reports a 44.2 billion won SK hynix TC bonder order to Hanmi, and Kulicke & Soffa's FY2025 10-K lists ASM Pacific Technology among eight major equipment competitors. Returns were modest: the FY2025 announcement shows a continuing-operations adjusted gross margin of 38.3%, down 172 bps, and an adjusted SEMI segment profit margin of 8.4%. The 2026 interim results show a recovery, with SEMI's adjusted segment margin at 18.1% for 1H 2026. A contested technology lead with cyclical and recently thin returns supports a narrow moat, not a wide one.

source: www1.hkexnews.hk

Moat type intangibles ip

The FY2025 10-K locates the durable asset in design IP rather than manufacturing: 'We rely on contracts and intellectual property rights to protect our products and technologies from unauthorized third-party copying and use,' with approximately 7,200 U.S. patents and about 18,900 patent matters worldwide spanning x86 EPYC/Ryzen CPUs, CDNA/RDNA graphics and the Versal/Zynq adaptive-SoC families, and it credits customer wins to 'our broad IP portfolio and leadership in design, integration and advanced packaging.' It is explicitly not cost_scale: AMD is fabless and 'utilize[s] Taiwan Semiconductor Manufacturing Company Limited (TSMC) for the production of wafers' — the same leading-edge foundry its merchant competitors use, so no manufacturing-scale advantage accrues to it.

source: sec.gov

none

No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers.

source: sec.gov

intangibles ip

The advantage sits in bonding process technology rather than in customer lock-in. The FY2025 results announcement credits chip-to-wafer TCB orders to an 'ultrafine pitch TCB solution equipped with proprietary plasma AOR technology', and says its HBM4 12H TCB solutions 'were the first to secure orders from multiple players'. TrendForce (2026-01-28, citing EE Times China) says ASMPT holds TCB and hybrid bonding capability, 'which the industry widely regards as the second most important technologies after lithography'. Kulicke & Soffa's FY2025 10-K says assembly equipment competes on 'price, speed/throughput, production yield, process control, delivery time, innovation, quality and customer support', which rewards technology. Switching costs are the weaker candidate: TrendForce (2025-12-12) shows SK hynix sourcing HBM4 TC bonders from both ASMPT and Hanmi.

source: www1.hkexnews.hk

Leadership fast follower

The FY2025 10-K itself places AMD behind the pace-setter in its two most important markets: 'Our principal competitor in the supply of discrete graphics is Nvidia, who is the discrete GPU market share leader,' and the risk factors state Nvidia 'leverages its market position in data center GPU, financial resources, and proprietary software ecosystem to promote its systems and influences customers who do business with us.' AMD is nonetheless executing 'an annual cadence of leadership for AMD Instinct solutions' and has won gigawatt-scale commitments (OpenAI, 6 GW) — following fast and closely, not setting the pace.

source: sec.gov

fast follower

No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted.

source: sec.gov

co leader

In HBM TCB, TrendForce (2025-12-12, citing The Elec) reports that roughly half of the about fifty TC bonders SK hynix uses for HBM4 came from ASMPT, and that SK hynix ordered seven more ASMPT systems at about 4 billion won each. Hanmi remains a major supplier: TrendForce (2026-06-09, citing ET News and Hankyung) reports a new SK hynix order to Hanmi worth 44.2 billion won, believed to cover around 15 units. In logic, ASMPT calls itself the 'Process-Of-Record' for chip-to-substrate TCB, which is its own claim. In wire and die bonders, Kulicke & Soffa's FY2025 10-K names ASM Pacific Technology among its major equipment competitors. The only third-party supplier split found covers one customer, SK hynix, and no third-party share figure for TCB, wire bonders or SMT was found, so the band is co_leader rather than clear_leader.

source: www1.hkexnews.hk

Pricing power moderate

FY2025 gross margin was 50%, up from 49% in 2024 per the 10-K — healthy and improving — but the same filing attributes average-selling-price pressure to competitors: Intel 'uses its microprocessor market position to price its products aggressively and target our customers and channel partners with special incentives. These aggressive activities have reduced and may reduce our unit sales and average selling prices for many of our products'. Pricing power is real but contested.

source: sec.gov

weak

The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power.

source: sec.gov

moderate

Margins are healthy for equipment but not exceptional, and they move with volume. The FY2025 results announcement reports SEMI's adjusted gross margin at 43.3% (down 240 bps) and SMT's gross margin at 32.4% (down 218 bps), with a group adjusted gross margin of 38.3%. The 2026 interim results report Q2 2026 adjusted gross margins of 46.5% for SEMI and 36.8% for SMT, and attribute both year-on-year increases largely to higher volume. TrendForce (2026-01-28, citing EE Times China) says SMT 'mainly serves traditional PCB assembly', while semiconductor packaging equipment, 'especially advanced packaging tools for AI chips', offers 'significantly higher pricing power and margins'.

source: www1.hkexnews.hk

Summary

AMD's edge is architectural design IP executed on someone else's fabs. The FY2025 10-K describes a full-stack portfolio — EPYC server CPUs, Instinct AI accelerators, Ryzen client parts where 'AMD was the first company to integrate a dedicated neural processing unit (NPU) on the same SoC as an x86 CPU for AI PCs,' Radeon graphics, Pensando networking and Versal adaptive SoCs — backed by roughly 18,900 patent matters worldwide, and it discloses gigawatt-scale customer commitments (an October 2025 agreement with OpenAI 'to deploy 6 gigawatts of AMD GPUs,' first gigawatt on Instinct MI450). The same filing bounds that moat: Nvidia is 'the discrete GPU market share leader' and 'leverages its market position in data center GPU, financial resources, and proprietary software ecosystem'; Intel 'uses its microprocessor market position to price its products aggressively'; Arm architectures and customers who 'internally develop products to support similar AI workloads' are named as encroaching; and every wafer at 7 nm or below comes from TSMC. Revenue grew 34% in FY2025 with Data Center up 32%, but the filing's own competitive framing places AMD in the challenger seat rather than the entrenched one.

Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent.

ASMPT makes back-end manufacturing equipment in two segments. Semiconductor Solutions (SEMI) sells die and wire bonders, thermo-compression and hybrid bonders, and photonics assembly tools. SMT Solutions sells surface-mount systems for circuit-board assembly. In FY2025, continuing-operations revenue was HK$13,736.2 million, up 10.0%. SEMI contributed HK$7,380.5 million and SMT HK$6,355.8 million. Advanced packaging revenue was US$532.1 million, up 30.2% and 30% of group revenue, with a significant contribution from TCB. The company estimates the TCB market at about US$760.0 million in 2025, rising to US$1.6 billion in 2028, and targets a 35 to 40 percent share. Business accelerated in 2026. Continuing revenue for 1H 2026 was HK$8,902.6 million, up 42.5% year on year, at a 41.1% gross margin. In July 2026 the company received bulk orders for more than 50 chip-to-substrate TCB tools from OSAT customers. In memory, the interim results say the timing of new TCB purchases 'remains dependent on HBM4 product rollout schedules'. The portfolio is being reshaped. The sale of the NEXX deposition business closed on 3 June 2026, and TrendForce (2026-05-05) reported Applied Materials as the buyer at a base value of US$120 million. On 21 January 2026, ASMPT began a strategic options assessment for SMT that includes a possible divestiture, joint venture, spin-off or listing. The verdict is a narrow moat: a credible TCB position in a market shared with Hanmi and others, attached to mainstream bonder and SMT businesses with ordinary margins.

Chain position

A fabless merchant-silicon designer sitting one layer above the foundries: the FY2025 10-K states AMD relies on TSMC 'for the production of all wafers for microprocessor and GPU products at 7 nanometer (nm) or smaller nodes' and primarily on GLOBALFOUNDRIES above 7 nm, with packaging and test performed by Asia-Pacific ATMP partners — so its cost, supply and cadence are inherited from partners it does not control.

Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining.

Back-end equipment supplier to IDMs, OSATs, memory makers and electronics assemblers. China was 41% of 2025 revenue and the top five customers about 16%, per the FY2025 results announcement.

Products (share / barrier)
  • Bitcoin mining (Odessa) Unknown · Low source: sec.gov
  • HPC data center leasing (Black Pearl, Barber Lake, Stingray) Challenger · Moderate source: sec.gov
Long-horizon vote +0.06 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →

-0.06 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

+0.13 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →