Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing ASML×Hut 8×Oracle× maximum of 3 — remove one to swap
ASML ASML ai moat: latest change 2025-12-31 Hut 8 HUT ai moat: latest change 2026-02-25 Oracle ORCL ai moat: latest change 2026-06-22
Moat rating wide

ASML's FY2025 20-F states it "is currently the world's only manufacturer of EUV lithography systems" — an effective monopoly on the extreme-ultraviolet tools required to pattern leading-edge logic and memory chips.

source: sec.gov

narrow

The FY2025 10-K says 'we believe we have established a defensible competitive advantage through our power-first, innovation-driven strategy', resting on a power-native team, an application-agnostic framework for digital infrastructure design, end-to-end greenfield development capabilities, and the use of ASIC compute builds to rapidly and cost-effectively secure and monetize power. What separates this from no moat is scarce power: the filing says demand for energy capacity continues to outpace supply and that 'grid interconnection bottlenecks have further constrained access to power and digital infrastructure development', and Hut 8 reports 330 MW of utility capacity under construction at River Bend, commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity, plus 1,230 MW of utility capacity under development. The same filing says 'The industries in which we operate are highly competitive and continuously evolving.', warns that these factors 'might not provide the competitive advantage we anticipate, or if they do, such competitive advantage might not endure', cites the River Bend lease (valued at $7.0 billion over the base term) as an example of expecting a significant portion of revenue from a limited number of customers, and says the company has not maintained consistent profitability. That supports narrow at most, not wide.

source: sec.gov

wide

Oracle's FY2026 10-K (fiscal year ended May 31, 2026) describes an installed base in which "substantially all customers opt to purchase software support contracts when they purchase an Oracle software license"; that entrenchment shows up externally as the #1 DB-Engines database ranking (August 2026, first of 435 systems) and $638B of contracted Remaining Performance Obligations at Q4 FY2026 (press release, June 10, 2026) — a durable, multi-decade lock on mission-critical enterprise data layers.

source: sec.gov

Moat type intangibles ip

The durable advantage rests on decades of proprietary technology and IP — the 20-F describes ASML's April 2025 1,000-watt EUV light source as "built on 25 years of engineering advancements" — reinforced by an exclusive arrangement with Carl Zeiss SMT as its "sole supplier" of the critical optics no rival can source.

source: sec.gov

cost scale

The 10-K says 'we believe success depends on the ability to secure scarce assets like power, data center equipment, and customers', and places part of its claimed edge in 'our ability to use ASIC compute infrastructure development to rapidly and cost-effectively secure and monetize power'. Its examples: Vega was energized less than a year after acquisition for an all-in cost of about $455,000 per megawatt, which the filing calls 'a fraction of traditional data center costs', and Salt Creek was completed for about $250,000 per MW; Vega also has immediate access to some of the lowest locational wholesale power prices in North America. These are low-redundancy ASIC compute builds, which the 10-K says carry relatively low capital intensity by design. The 'fraction of traditional data center costs' comparison is against a different facility tier, and the filing gives no peer cost comparison and no cost figure for its AI campuses.

source: sec.gov

switching costs

The core moat is the cost of moving mission-critical databases and back-office suites: the FY2026 10-K notes substantially all license customers attach support contracts and that Oracle's Multicloud Database offerings run Oracle AI Database inside other hyperscalers' clouds — monetizing the installed base even when the customer's infrastructure leaves; the KLAS 2026 EHR report shows the same dynamic in health IT, where roughly a third of Oracle Health customers want to leave but feel unable to do so.

source: sec.gov

Leadership clear leader

Effectively 100% of the EUV market as the world's only EUV system maker; in the older DUV segment it "compete[s] primarily with Canon and Nikon" yet remains the leading supplier.

source: sec.gov

fast follower

The 10-K says 'For example, we signed our first large scale single tenant AI data center lease and commenced construction of the site at our River Bend campus.', offered under the statement that to remain competitive with peers it may need to modify aspects of its business model. River Bend was commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity; Fluidstack is expected to serve as tenant and Google is expected to provide a financial backstop, and initial delivery is targeted for Q2 2027. On speed, the filing says 'Through early engagement with Entergy Louisiana, we assumed key interconnection and development functions typically managed by the utility, such as the development of transmission and distribution infrastructure, materially accelerating originally quoted power delivery timelines.', and that Vega was energized 'less than a year after acquiring it'. It also warns that Hut 8 competes against companies 'that may be more established or have greater financial and other resources and/or expertise'. That describes a newer entrant moving quickly, not an established leader.

source: sec.gov

co leader

Split by line: clear leader in database (DB-Engines August 2026 ranks Oracle #1 and Oracle-owned MySQL #2 of 435 systems); one of the largest enterprise-application vendors ($15.9B FY2026 SaaS revenue, competing with SAP, Salesforce, Workday and Microsoft per the FY2026 10-K); but in cloud infrastructure a ~4%-share fast-growing challenger behind Amazon (28%), Microsoft (20%) and Google (15%) per Synergy Q2 2026 data (The Register, 2026-08-01), and #2 in US acute-care EHR behind Epic (KLAS 2026).

source: sec.gov

Pricing power strong

FY2025 gross margin of 52.8%, up 1.5 percentage points year over year, with management guiding toward 56-60% by 2030 — consistent with monopoly pricing power on EUV tools.

source: sec.gov

weak

The 10-K says ASIC compute, run through American Bitcoin, can only be profitable if hardware and electricity costs are below the price of the Bitcoin mined, which makes it a price-taking business. It also says Traditional Cloud and AI Cloud compete with cloud services providers for customers, and that the company has not maintained consistent profitability. River Bend's contracted triple-net lease economics are not in service yet; initial delivery is targeted for Q2 2027.

source: sec.gov

moderate

Strong in the installed base — the FY2026 10-K states substantially all license customers purchase support contracts, a recurring stream customers rarely drop — but the same 10-K lists "total cost of ownership" first among key competitive factors and describes intense competition across every segment; AI-infrastructure deals are won against hyperscalers and neoclouds, and Q4 FY2026 SaaS grew a moderate 10% versus 93% for IaaS (press release, June 10, 2026).

source: sec.gov

Summary

ASML is the sole producer of EUV lithography systems, the only tools able to pattern the most advanced logic and memory nodes, with a roadmap "intended to drive affordable scaling to 2030 and beyond" and a High-NA EUV (TWINSCAN EXE) platform on which customers "had run more than 400,000 wafers" by end-2025. That dominance is protected by 25 years of accumulated engineering IP and an exclusive lock on Carl Zeiss SMT optics that competitors cannot replicate.

Per its FY2025 10-K, Hut 8 is a power-first infrastructure developer. It originates powered land and interconnections, uses ASIC compute builds, which the filing says combine relatively low capital intensity with rapid deployment, as a transitional load to monetize sites sooner, and aims to transition suitable power assets to higher-return uses; its River Bend campus was commercialized through a 15-year AI data center lease. The filing claims a defensible advantage but warns it might not provide the advantage anticipated, or might not endure. It says Hut 8 competes for powered land with digital infrastructure developers and large-scale Bitcoin miners, and its first AI campus is still under construction. Its majority-owned Bitcoin miner, American Bitcoin, can only be profitable when mining costs are below the price of the Bitcoin mined, and the filing says it believes American Bitcoin must keep acquiring miners to keep up with a growing global network hashrate.

Oracle pairs the deepest switching-cost franchise in enterprise software — the #1-ranked database (DB-Engines, August 2026) plus Fusion/NetSuite back-office suites, with support attach near-universal per the FY2026 10-K — with a late but explosive push into AI cloud infrastructure: Q4 FY2026 IaaS revenue grew 93% to $5.8B and RPO reached $638B (up 363% YoY), mostly large-scale AI contracts (press release, June 10, 2026). The two reinforce each other via multicloud — Oracle Multicloud AI Database grew 404% in Q4 running inside rival clouds. The offsets: in cloud infrastructure Oracle is still a ~4%-share challenger behind AWS/Microsoft/Google (Synergy Q2 2026 data via The Register), the AI buildout drove FY2026 free cash flow to negative $23.7B, and the Cerner-based Oracle Health business has lost US hospital share for three straight years (KLAS 2026).

Chain position

Upstream chokepoint of the AI chip supply chain: every leading-edge logic/DRAM wafer for AI accelerators is patterned on ASML EUV tools, making it the single indispensable equipment supplier to TSMC, Samsung and Intel.

Power-first developer building AI data center capacity, beginning with River Bend under a 15-year lease (Fluidstack is the expected tenant and Google is expected to provide a financial backstop; initial delivery is targeted for Q2 2027), and runs Bitcoin mining through majority-owned American Bitcoin.

Supply-chain role in AI: OCI sells GPU compute for AI training and inference — the Q4 FY2026 press release attributes most of the $85B sequential RPO increase to large-scale AI contracts (some with customer-prepaid or customer-supplied GPUs totaling $75B) and guides FY2027 total revenue to $90B — making Oracle a primary capacity supplier to AI model builders.

Products (share / barrier)
Long-horizon vote +0.42 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →

-0.01 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.30 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →