Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| Cipher Mining | Core Scientific | EMCOR Group | |
|---|---|---|---|
| Moat rating | none Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none. | narrow Core Scientific's position rests on long-dated, take-or-pay leases of energized capacity, not on a protected market. Its 2025 Form 10-K (filed 2026-03-02) says wholesale colocation "typically involves large, long-term agreements with a limited number of customers, often with initial terms of 10 years or more". It adds that such leases are frequently paired with take-or-pay commitments "under which the customer is obligated to pay for leased customer power capacity regardless of utilization, providing operators with revenue visibility over the contract term." On the Q2 2026 call (2026-07-28, https://d1io3yog0oux5.cloudfront.net/_fda3a1f2f1890adaa7ac6c4d9d310971/corescientific/db/1085/11280/prepared_remarks/2Q26+Prepared+Remarks+Transcript+PDF.pdf) management said the company "now has approximately 1.1 gigawatts of total contracted billable capacity, representing more than $24 billion of base contracted revenue". That total combines CoreWeave's 590 MW, on what the CFO called "the 12-year lease terms", with AMD agreements for 530 MW that carry "more than $14 billion of base contracted revenue across the 15-year agreements with 2.5% annual escalators". Management also said it was "currently billing for 437 megawatts of capacity". The limits are just as clear. The 10-K says "Competitors compete on price, facility location, reputation and perceived skill with respect to performance" and that many rivals "are more established, have better brand recognition, are well capitalized". It also says "One customer, CoreWeave, currently accounts for 100% of our Colocation segment revenue." The Q2 2026 10-Q says a material weakness tied to converting mining facilities to HPC "has not been remediated". Long take-or-pay terms are the norm in wholesale colocation, so the contracts alone are contracted revenue, not an edge over rivals. What supports narrow is capacity already billing and a tenant that has expanded in place, and even that is bound to those contracts and to one customer today, so the band is narrow, not wide. | narrow The FY2025 Form 10-K describes an edge that holds on large, complex work but not across the trade. On the advantage side, it says an invitation to bid "is often conditioned upon prior experience, technical capability, and financial strength", that its largest projects "typically require significant technical and management skills and the financial strength to obtain performance bonds, which are often a condition to bidding for and winning these projects", and that those projects "represented approximately 58% of our electrical and mechanical construction services revenues in 2025". It adds: "We believe our financial position, operating results, access to bank credit and surety bonding, technical expertise including prefabrication, VDC, and BIM capabilities, and safety record, among other factors, give us an advantage over many of our competitors." Operating margin was 10.1% in 2025 against 9.2% in 2024, and the filing notes the 2025 figure includes a $144.9 million gain on the sale of the United Kingdom operations that "positively impacted operating margin by 85 basis points". On the limiting side, the same Competition section says "relatively few barriers exist to prevent entry into the electrical and mechanical construction services industry" and "there are relatively few barriers to entry into the building services industry". Item 1A adds that "Certain of our competitors have lower overhead cost structures and, therefore, are able to provide their services at lower rates than we are currently able to provide" and that work "is frequently awarded through a competitive bidding process". An advantage confined to bonded, technically demanding projects, in a trade the company itself calls easy to enter, is a narrow moat, not a wide one. |
| Moat type | none No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers. | switching costs The lock-in is contractual and physical. The 10-K's description of colocation is that "Customers deploy and manage their own hardware, while the operator designs, builds and operates the underlying infrastructure", under take-or-pay leases "often with initial terms of 10 years or more". On the Q2 2026 call the COO described the AMD program as "an integrated colocation platform engineered to support AMD's Helios Rack-Scale systems" with a "close-coupled AMD design framework". Leaving would mean rebuilding that power, cooling and fit-out elsewhere. The relationship with CoreWeave shows the stickiness: it "began with a 16-megawatt lease at our Austin campus in 2024 and has since expanded to 590 megawatts of total contracted capacity". Intellectual property is not the source. The 10-K says the company has "filed over 130 patent applications" but that these laws and procedures "provide only limited protection". Scale is not the source either: the 10-K says rivals are "well capitalized" and some are organized to lower "their external cost of capital". | cost scale The 10-K places the advantage in capabilities that come with size rather than in customer lock-in or protected technology. The edge it names is "financial position, operating results, access to bank credit and surety bonding, technical expertise including prefabrication, VDC, and BIM capabilities, and safety record", delivered through "approximately 100 operating subsidiaries" and approximately 44,000 employees. MD&A credits the mechanical construction segment's 2025 result to "a more favorable mix of work and better project execution, including enhanced productivity, due in part to investments in virtual design and construction, prefabrication, and automation". Item 1A makes bonding a scale matter: "if we were to experience an interruption or reduction in the availability of bonding, we may be unable to compete for or work on certain projects." The filing cites no patents as a source of advantage, and switching costs are thin by its own account: "Many of our contracts, especially our building and industrial services contracts, may be canceled or delayed on short notice". |
| Leadership | fast follower No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted. | fast follower No independent share or rank was found. The 10-K lists Aligned Data Centers, Compass Datacenters, Equinix, Digital Realty Trust, NTT, QTS, Switch, Vantage Data Centers and CyrusOne as HDC competitors and says "Many of these competitors are more established, have better brand recognition, are well capitalized". It separately names Applied Digital, Cipher Mining, Galaxy Digital, Hut 8, IREN and TeraWulf as miners converting facilities for AI and HPC customers. Against that field Core Scientific is scaling quickly from a small base: 437 MW billing and about 1.1 GW contracted at the Q2 2026 call. That makes it a fast follower behind larger incumbents. Its press releases describe the company as "a leader in designing, building and operating large scale, purpose-built data centers", but that is the company's own claim and is not counted. | co leader The 10-K gives no market share. It calls the field "highly fragmented" with "thousands of small companies across the United States", adds that "there are a number of larger companies focused on providing electrical and/or mechanical construction services, such as APi Group Corporation, Comfort Systems USA, Inc., Dycom Industries, Inc., Everus Construction Group, Inc., IES Holdings, Inc., MasTec, Inc., MYR Group Inc., Quanta Services, Inc., and Tutor Perini Corporation", and describes EMCOR as "one of the largest specialty contractors in the United States", which is the company's own account. Outside the filing: Wikipedia's EMCOR article (https://en.wikipedia.org/wiki/Emcor) states that "In 2025, the company was ranked 2nd by Engineering News-Record on its list of the largest 600 specialty contractors by revenue"; its footnote links ENR's 2025 Top 600 preview page, which refused this fetch with HTTP 403, so the rank was not read at ENR itself (the footnote's title also reads 2024 while its link is the 2025 page). Statista's summary of the ENR survey for 2018 (https://www.statista.com/statistics/467307/leading-us-firms-in-mechanical-based-on-revenue, published Oct 21, 2019) says "EMCOR Group was ranked as the leading mechanical contractor based in the United States in 2018" and that the overall survey was "topped by electrical contractor Quanta Services and closely followed by EMCOR Group". A filing-based check agrees on scale against one named rival: stored fundamentals from the FY2025 10-Ks show EMCOR revenue of $16,986,422 thousand against $9,101,641 thousand for Comfort Systems USA (https://www.sec.gov/Archives/edgar/data/1035983/000110465926017530/0001104659-26-017530-index.htm). Second place on a revenue ranking of 600 specialty contractors, in a field the 10-K says has thousands of firms, is co-leadership rather than clear leadership; the ranking evidence is second-hand or dated, so the band is held at co-leader and no higher. |
| Pricing power | weak The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power. | moderate Price is set competitively at signing and then locked in. The 10-K says "Competitors compete on price" and warns that "If we fail to accurately estimate the factors upon which we base our contract pricing, we may generate less profit than expected or incur losses on those contracts". Once signed, the AMD agreements carry "2.5% annual escalators" (Q2 2026 call), and the Q2 2026 10-Q says "power costs are passed through to our customer without markup". To win AMD, the company also gave AMD "market-priced warrants to purchase Core Scientific's common stock, subject to certain commercial conditions" (AMD release, 2026-07-28, https://investors.corescientific.com/news-events/press-releases/detail/138/core-scientific-and-amd-announce-infrastructure-partnership). In Q2 2026, colocation revenue was $136,669 thousand and the cost of colocation services was $56,686 thousand, including $35,073 thousand of power fees passed through to the customer (10-Q). Contracted escalators protect price over a 12- to 15-year term, but nothing shows a premium over rivals, so pricing power is moderate. | moderate Margins have widened, but the filing says most work is bid. The 2025 Annual Report's five-year highlights show gross profit of $1,501,737 thousand on revenues of $9,903,580 thousand in 2021, $2,089,339 thousand on $12,582,873 thousand in 2023 and $3,282,988 thousand on $16,986,422 thousand in 2025; MD&A gives gross profit margin of 19.3% in 2025 against 19.0% in 2024. The Q2 2026 release (https://emcorgroup.com/application/files/3517/8535/6062/2Q26_Earnings_Release_Final.pdf) reports operating margin of 10.6% against 9.6% a year earlier, and the chief executive said "We remain focused on maintaining pricing discipline, carefully selecting project opportunities, and executing at a high level across our operations." The limits are in the 10-K: "Competition can place downward pressure on our contract prices and profit margins"; on commodities, "While we believe we can increase our prices to adjust for some price increases in commodities, there can be no assurance that price increases of commodities, if they were to occur, would be recoverable", and "certain of our contracts do not allow us to adjust our prices"; and Note 3 shows projects whose profitability was revised down by more than $1.0 million each reduced operating results by $85,941 thousand in 2025, against $66,319 thousand in 2024. |
| Summary | Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent. | Core Scientific began as a bitcoin miner and is turning its sites into high-density colocation (HDC) data centres for AI and HPC tenants. At 31 December 2025 it owned or leased ten data centres across seven U.S. states, with "approximately 1.4 gigawatts ("GW") of gross utility power capacity, or approximately 920 megawatts ("MW") of total leasable customer power capacity", and it intends "to convert every megawatt in our portfolio to high-density colocation infrastructure over the next three years" (2025 10-K). The transition is now visible in the numbers: colocation revenue "represented 77% of total revenue" in the first half of 2026, against 12% a year earlier (Q2 2026 10-Q). By July 2026 the company was billing for 437 MW. It had about 1.1 GW contracted with two anchor customers, CoreWeave at 590 MW and AMD at 530 MW (about 380 MW leased directly to AMD and about 150 MW for a neocloud that AMD backs), and AMD holds an exclusive right, under specified conditions, to lease as much as 2 additional gigawatts (Q2 2026 call). Those long take-or-pay contracts, plus energized power at a time when the 10-K says utilities demand "significant collateral postings at contract execution" and large builds take "18 to 24 months, or longer", are the source of a narrow advantage. They do not make a protected franchise. The 10-K names nine established colocation providers and six converted miners as competitors, says competitors "compete on price", and reports that CoreWeave was 100 percent of colocation revenue. The Q2 2026 10-Q says colocation revenue "is concentrated with a single customer" and that the conversion-related material weakness is still unremediated. Build costs are "approximately $11 million to $12 million per megawatt" (Q2 2026 call), and the company expects to finance the AMD build-out through project-level bonds. Core Scientific is rated as having a narrow moat: contract-bound switching costs, with no evidence of a price premium or a scale advantage. | EMCOR Group installs and services electrical and mechanical systems in non-residential buildings and plants. Its FY2025 10-K reports revenues of $16.99 billion, approximately 72% from construction operations, approximately 21% from building services and approximately 7% from industrial services, through "approximately 100 operating subsidiaries"; the United Kingdom operations were sold on December 1, 2025. Data centres now drive the construction book: the network and communications market sector was $2,461,883 thousand, or 48%, of electrical construction segment revenue in 2025, against 34% in 2023, and $1,670,355 thousand, or 23%, of mechanical construction segment revenue, against 8% in 2023. Remaining performance obligations were $13.25 billion at the end of 2025, and the Q2 2026 results release (2026-07-30) put them at "a record $17.14 billion, compared to $11.91 billion as of June 30, 2025", with revenue guidance for 2026 raised to $20.00 billion - $20.50 billion. The 10-K's case for an edge is that bids for large work are "often conditioned upon prior experience, technical capability, and financial strength" and require performance bonds, and that EMCOR's balance sheet, bonding, prefabrication and VDC capabilities and safety record "give us an advantage over many of our competitors". The same filing sets the limits: the industry is "highly fragmented and our competition includes thousands of small companies across the United States", "relatively few barriers exist to prevent entry", most revenue comes from "projects requiring competitive bids", some rivals can price "at lower rates than we are currently able to provide", customers' in-house staff compete for building services, and the 10-K warns that if data centre spending "were to decrease, demand for our services could decline as we transition our resources to other sectors". Gross margin rose to 19.3% in 2025 from 19.0% in 2024, which MD&A attributes to "improved revenue mix and excellent project execution". A scale and execution edge on large, bonded projects, re-tested at every bid in an industry with low entry barriers, is a narrow moat. |
| Chain position | Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining. | Core Scientific leases powered, liquid-cooled data-centre capacity to AI compute providers: CoreWeave (590 MW) and AMD, including a neocloud that AMD backs (about 530 MW), per the Q2 2026 call. It sits between utilities and GPU cloud operators while it winds down bitcoin self-mining. | EMCOR builds the electrical and mechanical plant inside facilities, increasingly data centres: the 10-K says capital spending on data center infrastructure "is rapidly expanding, which has increased demand for our services in recent years". It works directly for owners and "indirectly by acting as a subcontractor to general contractors, systems suppliers, construction managers, developers, property managers, and other subcontractors". Upstream, "we rely on third-party vendors and manufacturers to supply much of the materials and equipment necessary for our operations", with commodity exposure to "copper and steel" and fuel for a fleet of approximately 14,400 vehicles. |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | -0.06 at weight 0.20 · swarm bearish Editorial prior, not backtested. | +0.06 at weight 0.20 · swarm bullish Editorial prior, not backtested. | +0.13 at weight 0.20 · swarm neutral Editorial prior, not backtested. |