Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing IBM×Hut 8×Constellation Energy× maximum of 3 — remove one to swap
IBM IBM ai moat: latest change 2026-02-24 Hut 8 HUT ai moat: latest change 2026-02-25 Constellation Energy CEG ai moat: latest change 2026-02-24
Moat rating narrow

IBM's FY2025 10-K describes "a highly competitive environment" with "hundreds of competitors" and says IBM is "regularly exposed to new competitors" as it executes its hybrid-cloud/AI strategy, while differentiating through "incumbency with enterprises" and "client relationships and trust" — a real but narrow moat, not a wide one.

source: sec.gov

narrow

The FY2025 10-K says 'we believe we have established a defensible competitive advantage through our power-first, innovation-driven strategy', resting on a power-native team, an application-agnostic framework for digital infrastructure design, end-to-end greenfield development capabilities, and the use of ASIC compute builds to rapidly and cost-effectively secure and monetize power. What separates this from no moat is scarce power: the filing says demand for energy capacity continues to outpace supply and that 'grid interconnection bottlenecks have further constrained access to power and digital infrastructure development', and Hut 8 reports 330 MW of utility capacity under construction at River Bend, commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity, plus 1,230 MW of utility capacity under development. The same filing says 'The industries in which we operate are highly competitive and continuously evolving.', warns that these factors 'might not provide the competitive advantage we anticipate, or if they do, such competitive advantage might not endure', cites the River Bend lease (valued at $7.0 billion over the base term) as an example of expecting a significant portion of revenue from a limited number of customers, and says the company has not maintained consistent profitability. That supports narrow at most, not wide.

source: sec.gov

wide

The FY2025 10-K describes the nation's largest nuclear fleet — approximately 22 GW across 14 stations producing 68% of 2025 electric supply — running at a 94.7% capacity factor that 'has been approximately four percentage points better than the industry average annually since 2013', with NRC licences extending to 2054 and an IRA nuclear production tax credit floor from 2024.

source: sec.gov

Moat type switching costs

The 10-K roots IBM's differentiation in "incumbency with enterprises" and "client relationships and trust" — installed-base lock-in across its hybrid-cloud platform (Red Hat) and enterprise software and infrastructure raises switching costs.

source: sec.gov

cost scale

The 10-K says 'we believe success depends on the ability to secure scarce assets like power, data center equipment, and customers', and places part of its claimed edge in 'our ability to use ASIC compute infrastructure development to rapidly and cost-effectively secure and monetize power'. Its examples: Vega was energized less than a year after acquisition for an all-in cost of about $455,000 per megawatt, which the filing calls 'a fraction of traditional data center costs', and Salt Creek was completed for about $250,000 per MW; Vega also has immediate access to some of the lowest locational wholesale power prices in North America. These are low-redundancy ASIC compute builds, which the 10-K says carry relatively low capital intensity by design. The 'fraction of traditional data center costs' comparison is against a different facility tier, and the filing gives no peer cost comparison and no cost figure for its AI campuses.

source: sec.gov

cost scale

The cited edge is operating cost at scale: average refuelling outages of 22 days in 2025 against industry averages of 33 and 38 days in 2024 and 2023, a capacity factor about four points above the industry every year since 2013, and 'significant economies of scale' in what the filing calls the largest US customer-facing energy platform.

source: sec.gov

Leadership fast follower

An enterprise incumbent that differentiates via "incumbency with enterprises" but is "regularly exposed to new competitors" in its hybrid-cloud/AI push (FY2025 10-K) — a follower in the current AI cycle rather than its leader.

source: sec.gov

fast follower

The 10-K says 'For example, we signed our first large scale single tenant AI data center lease and commenced construction of the site at our River Bend campus.', offered under the statement that to remain competitive with peers it may need to modify aspects of its business model. River Bend was commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity; Fluidstack is expected to serve as tenant and Google is expected to provide a financial backstop, and initial delivery is targeted for Q2 2027. On speed, the filing says 'Through early engagement with Entergy Louisiana, we assumed key interconnection and development functions typically managed by the utility, such as the development of transmission and distribution infrastructure, materially accelerating originally quoted power delivery timelines.', and that Vega was energized 'less than a year after acquiring it'. It also warns that Hut 8 competes against companies 'that may be more established or have greater financial and other resources and/or expertise'. That describes a newer entrant moving quickly, not an established leader.

source: sec.gov

clear leader

The 10-K states Constellation is 'the largest nuclear energy company in the U.S.', is 'the nation's largest energy supplier for C&I and residential power volumes' based on EEI data, and has 'over 32% of the C&I market share of direct customer business'.

source: sec.gov

Pricing power moderate

Gross margin is high and rising (54.9% FY2021 to 58.2% FY2025) on a software-mix shift, but "price" is a principal method of competition per the 10-K and consulting/infrastructure remain price-competitive.

source: sec.gov

weak

The 10-K says ASIC compute, run through American Bitcoin, can only be profitable if hardware and electricity costs are below the price of the Bitcoin mined, which makes it a price-taking business. It also says Traditional Cloud and AI Cloud compete with cloud services providers for customers, and that the company has not maintained consistent profitability. River Bend's contracted triple-net lease economics are not in service yet; initial delivery is targeted for Q2 2027.

source: sec.gov

moderate

The 10-K states 'While providing customers with a competitive price is a key focus' in retail, on roughly two-year average C&I contract terms with 77% power and 84% gas renewal rates in 2025, and the nuclear fleet's downside is set by the IRA nuclear PTC 'as unit revenues decline below levels established in the IRA'; SEC-reported operating income was 13.6% of revenue in 2025.

source: sec.gov

Summary

IBM's moat rests on deep enterprise incumbency — sticky installed-base relationships across hybrid cloud (Red Hat), enterprise software, and mission-critical infrastructure, plus brand and a large patent base. But its own FY2025 10-K frames "a highly competitive environment" with "hundreds of competitors" and says IBM is "regularly exposed to new competitors" as it pursues hybrid cloud and AI, so the moat is durable but narrow and contested in the AI/cloud growth arena.

Per its FY2025 10-K, Hut 8 is a power-first infrastructure developer. It originates powered land and interconnections, uses ASIC compute builds, which the filing says combine relatively low capital intensity with rapid deployment, as a transitional load to monetize sites sooner, and aims to transition suitable power assets to higher-return uses; its River Bend campus was commercialized through a 15-year AI data center lease. The filing claims a defensible advantage but warns it might not provide the advantage anticipated, or might not endure. It says Hut 8 competes for powered land with digital infrastructure developers and large-scale Bitcoin miners, and its first AI campus is still under construction. Its majority-owned Bitcoin miner, American Bitcoin, can only be profitable when mining costs are below the price of the Bitcoin mined, and the filing says it believes American Bitcoin must keep acquiring miners to keep up with a growing global network hashrate.

Constellation pairs the largest US nuclear fleet with the largest competitive retail book, which lets it sell around-the-clock carbon-free power under long-term contracts such as the 20-year Microsoft PPA restarting Three Mile Island Unit 1 as the 835 MW Crane Clean Energy Center.

Chain position

A hybrid-cloud platform, enterprise-AI (watsonx), and consulting provider to large enterprises — a software/cloud layer of the AI stack.

Power-first developer building AI data center capacity, beginning with River Bend under a 15-year lease (Fluidstack is the expected tenant and Google is expected to provide a financial backstop; initial delivery is targeted for Q2 2027), and runs Bitcoin mining through majority-owned American Bitcoin.

Generator and retailer in one — the fleet is the physical supply behind the long-term carbon-free contracts it sells to large corporate buyers.

Products (share / barrier)
  • Carbon-free energy products (CORe+, Hourly CFE, long-term nuclear agreements) Unknown · Deep source: sec.gov
  • Competitive retail energy supply Leader · Moderate source: sec.gov
  • Natural gas and geothermal generation (including Calpine) Leader · Moderate source: sec.gov
  • Nuclear generation fleet Leader · Deep source: sec.gov
  • Wholesale power and gas marketing Unknown · Low source: sec.gov
Long-horizon vote +0.06 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

-0.01 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.38 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →